Thoughtfully designed. Beautifully built.

Home  /  Bathroom Remodeling

Bathroom Remodeling · Tallahassee, Florida

A bathroom that earns the first twenty minutes of your day.

Complete bathroom renovations for Tallahassee homes: walk-in showers, custom vanities, tilework and lighting, built to last in Florida humidity.

4 to 8 weeks on site
$35,000 to $95,000 typical

What we do

Bathroom remodeling Tallahassee, FL: where the details are structural, not decorative.

A bathroom is the smallest room we work in and the one where mistakes cost the most.

Most of what determines whether a bathroom lasts twenty years is invisible when it is finished. Which substrate went behind the tile. Whether the shower pan was sloped correctly and flood-tested before anything was set. How the waterproofing membrane was lapped at the corners and the curb. Where the exhaust fan actually vents. In a surprising number of Tallahassee houses, the answer is “into the attic.”

That matters more here than in most of the country. Florida humidity is relentless, and a bathroom detailed casually will tell you about it in five years, through a soft spot in the floor or a grout line that will not stay clean.

The visible part is the reason you are renovating: a shower you can walk into without stepping over anything, a vanity with real storage, tile that runs to the ceiling, and lighting that does not make you look ill at seven in the morning. We do both parts.

Pristine worker measuring a bathroom wall opening during renovation

Careful measurement during renovation · Pristine Renovations

The scope

What a Pristine bathroom includes.

Walk-in shower with pale blue subway tile and a black shower panel. Bathroom remodeling Tallahassee, FL.

Walk-In & Curbless Showers

Frameless glass, correctly sloped pans, benches, niches and multiple heads. Curbless entries built into the floor structure, not ramped over it.

Bathroom with a dark espresso double vanity and white quartz counter in Tallahassee, FL

Custom Vanities

Sized to the room and to how you use it: double basins where they earn their space, drawers instead of doors, and outlets inside the cabinet.

Brass handheld shower fitting on a slide bar against a marble-veined wall

Tilework

Large-format, handmade, mosaic or slab. Layout planned so cuts land where nobody looks and the pattern lands square at the corners.

Guest bathroom with an oak vanity, black basin and glass shower enclosure. Bathroom renovation in Tallahassee, FL

Lighting & Mirrors

Vanity lighting at face height rather than overhead, dimmable, and warm enough to be honest without being unflattering.

Walk-in shower with a teak bench, handheld shower on a slide bar and a polished support rail set into large-format tile. Tallahassee, FL

Waterproofing & Ventilation

Membrane systems, flood-tested pans, and an exhaust fan sized to the room that actually vents outside the building.

Brass faucet on a marble vanity top with a beaded mirror above

Storage

Linen towers, recessed niches, medicine cabinets set into the framing, and a place for the things currently on the counter.

Primary bathroom with a freestanding tub, sage double vanity and frameless glass shower in marble-veined tile. Tallahassee, FL

Featured project

Conservancy Drive Primary Bath

Tallahassee, FL

A 1990s primary bathroom built around a corner garden tub nobody had used in a decade, with a shower stall barely large enough to turn around in and a fluorescent box on the ceiling.

We took the tub out entirely and gave the footprint to the shower: frameless glass, a bench, a full-height marble-veined wall, and a handheld on a slide bar alongside the fixed head. The freestanding tub moved to the window, where it gets afternoon light. Vanity lighting came down to face height, and the ceiling fixture went away.

The room is the same size it was. It reads twice as large.

Duration
6 weeks
Scope
Primary bathroom, full gut
Era of home
1990s build

Before & after

One bathroom. Six weeks.

The original primary bathroom before renovation, with an oak vanity, a built-in tub surround and dated tileThe same bathroom after renovation, with a freestanding soaking tub, marble-veined tile and a patterned mosaic floor

An oak vanity, a built-in tub surround and a shower stall you could not turn around in. The footprint did not change. Removing the unused garden tub gave the space back to the shower, and the freestanding tub moved to the only window in the room.

In the detail

The parts that decide whether it lasts.

A leaking shower is almost never a tile problem. It is a substrate, slope or membrane problem that showed up as a tile problem three years later. We flood-test every pan before a single tile is set, and we size the exhaust fan to the room rather than to the box it came in.

Brass handheld shower fitting on a slide bar against a marble-veined wall

Handheld on a slide bar alongside the fixed head, on the same valve

Brass widespread faucet on a marble vanity top with an undermount basin

Widespread fittings set into a solid deck, with no seam at the basin

Detail of an undermount basin with a polished chrome widespread faucet on a marble-veined quartz vanity top. Tallahassee, FL

Vanity lighting set at face height, not overhead

Designed for how you live now

A bathroom that is easier to use should not look like it.

There is a version of this renovation that ends with a beautiful room, and a version that ends with a room that looks like it belongs somewhere else. The difference is almost entirely a matter of planning it in from the start rather than adding it at the end.

A curbless shower has no lip to step over because the floor structure was built to accommodate it, not because a ramp was fitted afterward. A support rail can be a polished towel bar rated to take a person’s full weight, set at the right height, in the right place. A wider doorway is just a doorway. Comfort-height fixtures are simply the height that is comfortable.

None of that reads as equipment. It reads as a well-designed bathroom, which is what it is.

We build these for clients in their forties and clients in their eighties, for the same reason: a room that is easy to use is easy to use for everybody, and it is one less renovation later.

Curbless walk-in shower with white subway tile, integrated support rails, a handheld shower on a slide bar and a basketweave mosaic floor. Bathroom renovation by Pristine Renovations in Tallahassee, FL

A step-free shower, built into the floor structure rather than ramped over it.

Walk-in shower with a teak bench, handheld shower on a slide bar and a polished support rail set into large-format tile. Tallahassee, FL

A teak bench and a support rail that reads as a towel bar.

What it costs

What a bathroom renovation costs in Tallahassee.

We publish these because guessing helps nobody.

Secondary Bath

$35,000 to $55,000

Guest or hall bathroom, full renovation, same footprint.

Primary Bath

$65,000+

Primary suite bathroom with a walk-in shower and double vanity.

Suite Renovation

$95,000+

Bathroom and closet reconfigured together, or structural changes.

What moves a project within a band: the size of the room, whether the shower is curbed or curbless (curbless requires structural floor work), tile format and layout complexity, whether plumbing fixtures stay where they are, and whether the existing subfloor and framing are sound once the old room comes out, which, in a bathroom, they are not always.

How it works

Five steps, in bathroom terms.

01

Consultation

We look at the room, talk about what you want it to feel like, and check the things you cannot see: where the plumbing runs, where the fan vents, whether the floor is sound.

~1 week
02

Design & Selections

Layout, then a tile plan drawn to scale so you can see exactly where cuts land. Fittings, vanity, lighting and stone selected together.

2 to 3 weeks
03

Contract & Schedule

Fixed scope, fixed price, written dates. Contract review is separate from permitting and procurement. Specialty tile can take 4 to 8 weeks after ordering; demolition waits for delivery and required permits.

Contract review: ~1 week
04

Build

Demolition, then the invisible work: framing corrections, plumbing, electrical, waterproofing, and a flood test on the shower pan before tile. Then tile, stone, fittings and glass. We agree which bathroom the household uses before we start.

4 to 8 weeks
05

Walkthrough

We run every fixture together, check every joint, and you build the punch list. Care instructions for stone and grout, warranty documents, keys back.

~3 days

More bathroom projects

Recent bathroom work in Tallahassee.

Glen Abby Guest Bath

Tallahassee, FL · 2025

Winged Foot Primary Bath

Tallahassee, FL · 2025

Mallard Trace Powder Room

Tallahassee, FL · 2025

Walk it with us

A finished bathroom, end to end.

A completed primary bath filmed after handover: a full-height tiled shower under the original arched window, a pebble floor, and a bench built into the wall rather than added on afterwards.

More bathrooms

Three more showers, three different problems.

Tile format, drainage and glazing all change depending on the room we are given.

Walk-in shower in large-format stone tile with a pebble floor and a recessed niche. Tallahassee, Florida.

Large-format stone with a pebble floor for grip

Shower in slate-toned subway tile with a sliding glass door and a pebble floor. Tallahassee, Florida.

Slate-toned subway tile behind a sliding door

Glass shower enclosure above a harlequin tile floor. Tallahassee, Florida.

A harlequin floor set under frameless glass

Where we work

Bathroom remodeling in Golden Eagle Plantation and Killearn Lakes accounts for a lot of what we build, along with Bobbin Trace and the older homes around Myers Park, where the original bathroom is often still the only one in the house. We also renovate bathrooms in Killearn Estates, Ox Bottom Manor, SummerBrooke, Betton Hills and Waverly Hills, and across Leon County.

Common questions

Bathroom questions, answered plainly.

A secondary bathroom typically runs 4 to 6 weeks on site; a primary bathroom 6 to 8 weeks. Design and selections come first. Permitting and material procurement are separate: specialty tile can take 4 to 8 weeks after ordering, and demolition waits for delivery and required permits. We agree at the start which bathroom the household will use during the build. If there is only one, we discuss that before you commit.

In most cases, yes. A genuine curbless entry means the floor structure is modified so the shower floor sits level with the room. That is a framing question, not a tile question, and exactly the kind of work a building contractor license covers. On a concrete slab it is more involved than on a raised floor, but it is still routine. We will tell you which one you have at the first visit.

Most of our bathroom renovations fall between $35,000 and $95,000, depending on whether it is a secondary or primary bathroom, whether fixtures move, and the tile and stone selected. Renovations that reconfigure the bathroom and closet together run above that.

No, not if it is planned that way from the beginning rather than added at the end. A curbless shower is just a shower without a step. Support rails can be finished to match the fittings and read as towel bars. Comfort-height fixtures are simply a comfortable height. Everything we build in this category is designed as a bathroom first.

Florida humidity is unforgiving, and an undersized fan, or one that vents into the attic instead of outside, which we find regularly, will produce mold, failed grout and soft drywall within a few years. We size the fan to the room and confirm it terminates outside the building envelope. It is a small line item that decides how the room ages.

Not unless you want it. Removing an unused garden tub is one of the most common and most transformative changes we make to a 1990s primary bathroom. The footprint goes to the shower and the room reads far larger. If you want a tub, a freestanding one in a well-lit corner is almost always better than a built-in surround.

Most of our bathroom work is in Golden Eagle Plantation, Killearn Lakes, Bobbin Trace and Killearn Estates, plus the older homes around Myers Park and Betton Hills where the house often has one bathroom doing all the work. We also cover Ox Bottom Manor, SummerBrooke and Waverly Hills, and the rest of Leon County.

Let’s talk about your bathroom.

A consultation is a conversation, not a sales visit. We come to your home, look at the space, listen to what isn’t working, and tell you honestly what it will take, before anyone signs anything.

Scroll to Top